01How long does a recladding design and consent take?+
Timing depends on the existing building, investigation findings, design changes and specialist reports required. We set out the expected stages once the initial information and proposed scope are understood.
02Can we use a different cladding material?+
Often, yes. Changing materials affects detailing, cavity construction, junctions, structure, fire considerations and consent evidence, so it needs to be designed as a coordinated system.
03Will recladding fix a leaky home?+
A successful remedial reclad must address the causes and consequences of moisture entry, not only replace the visible cladding. Investigation and specialist advice may be needed to establish the correct repair scope.
04Do the windows need to be replaced?+
Not always, but windows and their interfaces are critical to weathertightness. Their age, condition, installation and suitability for the new wall system need to be assessed.
05Can we redesign the exterior at the same time?+
Yes. Recladding is often the best time to reconsider material composition, window emphasis, entries, roof-to-wall junctions and other elements that shape the home’s appearance.
06Do you arrange specialist reports?+
We coordinate the specialists appropriate to the project, which may include a building surveyor, structural engineer, quantity surveyor or other technical advisers.
07Can you help us compare cladding options?+
Yes. We consider appearance alongside technical suitability, durability, maintenance, detailing, consent evidence and likely budget impact.
08Can I stay in the house during recladding?+
That depends on the extent of work, weather protection, access and any damage discovered. Your builder should prepare a site-specific programme and advise what is safe and practical.
09Can we use our own builder?+
Yes. The approved documentation can be provided to your chosen builder, or you can ask us about an introduction to our trusted construction partner.